final logo

Energy Solutions can help you reduce your fuel bills

Projects Details

  • Home
  • Projects Details

SOLAR ENERGY

100 kWh – Solar Power project in Balochistan

CLIENT

UNHCR 

TECHNOLOGY

Solar PV panels

SYSTEM SIZE

100 kWp

ANNUAL OUTPUT

160,000 – 170,000 kWh

ANNUAL CO2 SAVINGS

100 tonnes

PAYBACK YEAR

4.5 Years

25-YEAR SAVINGS

PKR 180 Million

1 2

Project Objective

The client is a commercial agricultural enterprise in Balochistan seeking to reduce energy costs and eliminate frequent power outages that were affecting irrigation and processing operations.

To design and install a 100 kW solar power system that provides reliable, sustainable energy, lowers operational expenses, and minimizes dependency on diesel generators and inconsistent grid supply.

Challenges

Harsh Climate: High temperatures and dust required rugged, low-maintenance equipment.

Unstable Grid: Frequent power outages forced reliance on diesel generators, raising fuel costs.

Remote Location: Logistics and transportation of equipment to a remote area in Balochistan posed coordination challenges.

Our Solution

  • After a detailed site assessment and energy audit, Safehands implemented a fully customized solar solution:
  • Solar Array: 100 kW high-efficiency PV modules oriented for optimal sunlight capture.
  • Inverters & Controllers: Industrial-grade inverters with MPPT for maximum efficiency, suited to high-temperature conditions.
  • Mounting System: Corrosion-resistant, adjustable tilt mounting to withstand desert winds and allow seasonal angle optimization.
  • Monitoring System: Remote monitoring for real-time performance tracking and preventive maintenance alerts.
  • Battery Backup (Optional): Integrated lithium battery storage to ensure power continuity during extended outages.

Client Feedback

“The transition to solar has stabilized our operations and significantly cut power costs. The Safehands team delivered professional service from start to finish.”

Faraz Khan

Operations Manager

Implementation

  • Timeline: 4 weeks from site survey to commissioning
  • Installation Team: Certified solar technicians with specialized training for remote deployments
  • Safety & Compliance: All electrical work adhered to industry safety standards and regulatory requirements.
  • Results
  • Consistent Power Supply: Reduced outages and eliminated reliance on diesel generators.
  • Cost Savings: Estimated annual energy cost reduction of 35–45%, with projected ROI within 4 years.
  • Environmental Impact: Approx. 130 tonnes of CO₂ emissions avoided annually.
  • Low Maintenance: System optimized for minimal servicing in rugged conditions.

What We Provided